“教你轻松搞定”HTA吊式弹簧减震安装说明

安装说明VIEWS

HTA吊式弹簧减震安装说明


来源:https://www.songjiangjituan.com/1359.html 发布于:2018-11-14 04:03   浏览:6,841

HTA型吊式弹簧减震器安装说明
HTA Hanging type Spring shock absorber Installation instructions

安装前,请确认淞江集团吊式弹簧减震器的型号和规格是否正确。
Before installation,make sure the model and the specification are correct.
安装说明
Installation guide
所需工具:公制口径17mm(M10)、19mm(M12)、24mm(M16)开口扳手。
Required tools:17mm(M10)、19mm(M12)、24mm(M16)open wrenches.
先与安装位置处依据施工规范预埋符合荷重要求的基础螺栓。(如图1)
Embed required foundation bolts according to the loading on the installation location.(Fig 1)

ZTY吊式弹簧减震安装说明

吊式弹簧减震器结构图:
Hanging type shock absorber structure drawing:

外形尺寸表:
Outline dimension table:

规格 A
(mm)
B
(mm)
C
(mm)
h1
(mm)
h2
(mm)
H
(mm)
BD
(mm)
HTA-A 37 50 25 7 45 80 8-10
HTA-B 40 60 28 7 65 110 10
HTA-C 70 90 40 25 90 150 12-14
HTA-D/E 86 120 50 20 130 200 12-16

安装说明
Installation guide
将弹簧减震器装到预留安装位置的螺栓上面,并将螺栓锁紧。(如图2)
Fit spring dampers on the bolts at the reserved mounting position and lock the bolts.(Fig 2)
将弹簧减震器与设备连接的丝牙条装上。(如图3)
Fit the spring shock absorber with the wire bar attached to the device.(Fig 3)
使用上下两颗螺帽安装与设备连接的固定处,以便调整,此时上部螺帽不需要锁紧。(如图4)
Use the upper and lower two nuts to install the attachment to the device so that the upper nut does not need to be locked.(Fig 4)
将设备安装或配管安装完成。
Complete the equipeent and piping engineering installation.
使用开口扳手调整下部螺帽来调整设备水平及弹簧压缩量。(如图5)
Apply the open wrench to adjust lower nuts for the balance of the eqipment and the press amount for the spring.(Fig 5)
调整完成后将上下两颗螺帽相对锁紧,即可完成淞江集团HTA吊式弹簧减震器的安装调整。(如图6)
Lock the upper and lower nuts after adjusting.(Fig 6)

安装后请检查弹簧下压量,如弹簧压到底,则表示荷重不足,没有减震效果。应该更换较大荷重的弹簧减震器型号,并请于本公司业务人员联系。
After the adjustment,check the press amount of the spring.If it appears with insufficient loading,please replace with bigger loading by contacting our staff.
安装时 请注意安全。
Be cautious during the installation.
保养须知:每月要观察固定螺栓是否有松动,保持弹簧减震器安装时弹簧下压挠度是否正常。
Maintenance checking points:remain M12 fixed bolt locked,balance of the base,installation of the isolator,and the deflection of the spring.

图1)安装前,请确认淞江集团吊式弹簧减震器的型号和规格是否正确。
Fig 1)Before installation,make sure the model and the specification are correct.

图2)将弹簧减震器装到预留安装位置的螺栓上面,并将螺栓锁紧。
Fig 2)Fit spring dampers on the bolts at the reserved mounting position and lock the bolts.

图3)将淞江集团吊式弹簧减震器与设备连接的丝牙条装上。
Fig 3)Fit the spring shock absorber with the wire bar attached to the device.

图4)使用上下两颗螺帽安装与设备连接的固定处,以便调整,此时上部螺帽不需要锁紧。
Fig 4)Use the upper and lower two nuts to install the attachment to the device so that the upper nut does not need to be locked.

图5)使用开口扳手调整下部螺帽来调整设备水平及弹簧压缩量。
Fig 5)Apply the open wrench to adjust lower nuts for the balance of the eqipment and the press amount for the spring.

图6)调整完成后将上下两颗螺帽相对锁紧,即可完成淞江集团HTA吊式弹簧减震器的安装调整。
Fig 6)Lock the upper and lower nuts after adjusting.

点击下载:










最新推荐:
  • ·【青拓特钢连铸系统】伸缩接头合同
  • ·【牡丹江卷烟厂冷却塔系统】橡胶接头合同
  • ·水库抽水这样用橡胶接头,你见过吗?
  • ·【新疆八一钢铁】橡胶接头合同
  • ·【样册P22】全新设计可曲挠橡胶接头 严防假冒 防伪必究
  • ·【样册P11】工厂环境
  • ·【中国科学院武汉病毒研究所】中央空调橡胶接头
  • ·GDU3管道管夹橡胶减震器
  • ·SHM-4-2000螺杆式冷水机组弹簧减震器
  • ·全国橡胶接头行业通过TS压力元件生产许可“请认准淞江集团”